Sidewalk/Curb/Gutter Rapairs 6/25 and 6/26

On Monday June 25 the NORTH side of the cluster (see below) will have its sidewalk, curb and gutters repaired.

On Tuesday June 26, the SOUTH side of the cluster (see below) will have its sidewalk, curb and gutters repaired.

All vehicles in each region will need to be relocated before 7 AM on the day of your side’s repairs. Vehicles can be returned to their spots on the following day.

A tow truck will be on site to move any vehicles obstructing the equipment.

Comments

comments

Powered by Facebook Comments

About Dan Soschin

Dan Soschin is the president of Ridgewood Cluster Homeowners Association and has been a resident there since 2005.
This entry was posted in Uncategorized. Bookmark the permalink.